Evaluation and Analysis of Factors Affecting Delays in Large-Scale Complex Projects: Case Study of Oil Well Drilling

Authors

DOI:

https://doi.org/10.31181/sems31202529h

Keywords:

Mega-project, Oil-well drilling, Project delay, Complex projects, Oil and gas

Abstract

The expansion of project scale typically leads to increased complexity, resulting in heightened uncertainty and challenges in predicting issues, evolving conditions, and unexpected opportunities that emerge and are recognized post-initiation. Economic development programs in a country allocate substantial financial resources to oil and energy projects to enhance social welfare and quality of life. Considering the value of these resources and the investment of time, executed projects must minimize delays to avoid the wastage of national capital and allocate resources effectively to enhance the country's economic prosperity. This study examines the drilling of oil wells as a megaproject, conducting research and investigation into this large-scale complex endeavour. According to expert opinions, researcher experience, and prior studies, three hypothetical factors are identified as the most significant contributors to project delays. The sample population size was determined to be 33 individuals through a comprehensive survey, and the preliminary study results were employed using Cochran's formula and Morgan's table. A questionnaire comprising 49 questions was subsequently developed and formulated in accordance with the specified hypotheses. The questionnaire was randomly distributed and collected from the sample population following verification of its validity and reliability. Statistical inference methods were utilized to examine and evaluate the hypotheses through the application of Student’s t-test. The results of the three hypotheses are presented according to their significance, ranked from the most influential factor (highest effect) to the least influential factor (lowest effect) on project duration. The three factors are summarized as follows: 1) Performance of Contractors, 2) Performance of Domestic Producers, and 3) Performance of Project Owners.

References

Audikana, A., Beria, P., & Arellano-Yanguas, J. (2024). Megaprojects: Beyond the managerial and activist traps. Environment and Planning C: Politics and Space, 23996544241274065. https://doi.org/10.1177/23996544241274

Chishti, M. Z., & Sinha, A. (2022). Do the shocks in technological and financial innovation influence the environmental quality? Evidence from BRICS economies. Technology in Society, 68, 101828. https://doi.org/10.1016/j.techsoc.2021.101828

Cevikbas, M., Okudan, O., & Işık, Z. (2024). Identification and assessment of disruption claim management risks in construction projects: a life cycle-based approach. Engineering, Construction and Architectural Management, 31(1), 1-27. https://doi.org/10.1108/ECAM-05-2022-0470 .

Abbasi, O., Noorzai, E., Gharouni Jafari, K., & Golabchi, M. (2020). Exploring the causes of delays in construction industry using a cause-and-effect diagram: case study for Iran. Journal of Architectural Engineering, 26(3), 05020008. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000431

Yousri, E., Sayed, A. E. B., Abdelalim, A. M., & Farag, M. A. (2024). A combined method of collapsed As-Built and impact as planned delay analysis methods for construction projects. Journal of Advanced Engineering Trends, 43(2), 305-317. https://doi.org/10.21608/jaet.2023.210655.1247

Sanni-Anibire, M. O., Mohamad Zin, R., & Olatunji, S. O. (2022). Causes of delay in the global construction industry: a meta analytical review. International Journal of Construction Management, 22(8), 1395-1407. https://doi.org/10.1080/15623599.2020.1716132 .

Yap, J. B. H., Goay, P. L., Woon, Y. B., & Skitmore, M. (2021). Revisiting critical delay factors for construction: Analysing projects in Malaysia. Alexandria Engineering Journal, 60(1), 1717-1729., https://doi.org/10.1016/j.aej.2020.11.021

Omoush, M. M. (2020). Assessing and prioritizing the critical success factors and delays of project management implementation: Empirical evidence at construction projects in Jordan. International Journal of Business and Management, 15(10), 117. https://doi.org/10.5539/ijbm.v15n10p117

Shash, A. A., & AbuAlnaja, F. M. (2023). Causes of material delays in capital projects in Saudi Arabia. International Journal of Construction Management, 23(7), 1109-1117. https://doi.org/10.1080/15623599.2021.1956294

Shah, R., Kraidi, L., Matipa, W., & Borthwick, F. (2021, June). Investigation of the Risk Factors Causing Safety and Delay Issues in Oil and Gas Pipeline Construction Projects. In Global Congress on Manufacturing and Management (pp. 313-326). Cham: Springer International Publishing. https://doi.org/10.1007/978-3-030-90532-3_24

Noi, S., Jelínek, M., & Roubík, H. (2022). Small-scale biogas plants in Vietnam: How are affected by policy issues?. Ecological Questions, 33(4), 111-129. https://doi.org/10.12775/EQ.2022.037

Durdyev, S., & Hosseini, M. R. (2020). Causes of delays on construction projects: a comprehensive list. International journal of managing projects in business, 13(1), 20-46. https://doi.org/10.1108/IJMPB-09-2018-0178

Amadi, A. I. (2024). Investigating ground-related design deficiencies as potential triggers to cost overruns in highway projects. Journal of Financial Management of Property and Construction, 29(3), 349-371. https://doi.org/10.1108/JFMPC-02-2023-0008

Qian, Y., Yu, X. A., Chen, X., & Song, M. (2023). A model and simulation study of developers’ multicontract incentives for contractors’ green technology innovation decisions considering marketing efforts and innovation capability. Energy & Environment, 0958305X231205022. https://doi.org/10.1177/0958305X231205022

Babaeian Jelodar, M., Hemant Raut, P., & Saghatforoush, E. (2021). Contractor-delay control in building projects: Escalation of strategy from primary proactive to secondary reactive. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 13(2), 04521002. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000449

Zhu, G., Chou, M. C., & Tsai, C. W. (2020). Lessons learned from the COVID-19 pandemic exposing the shortcomings of current supply chain operations: A long-term prescriptive offering. Sustainability, 12(14), 5858. https://doi.org/10.3390/su12145858

Sa'eed, A., Gambo, N., Inuwa, I. I., & Musonda, I. (2020). Effects of financial management practices on technical performance of building contractors in northeast Nigeria. Journal of Financial Management of Property and Construction, 25(2), 201-223. https://doi.org/10.1108/JFMPC-07-2019-0064

Adebisi, E. O., Alao, O. O., & Ojo, S. O. (2020). Assessment of early warning signs predisposing building projects to failure in Nigeria. Journal of Engineering, Design and Technology, 18(6), 1403-1423. https://doi.org/10.1108/JEDT-08-2019-0214

Amoah, C., & Bikitsha, L. (2022). Emerging contractor's management and planning skills to overcome business risk factors. International Journal of Building Pathology and Adaptation, 40(4), 670-689. https://doi.org/10.1108/IJBPA-01-2021-0003

Bajjou, M. S., & Chafi, A. (2020). Empirical study of schedule delay in Moroccan construction projects. International Journal of Construction Management, 20(7), 783-800. https://doi.org/10.1080/15623599.2018.1484859

Published

2025-01-01

How to Cite

Hajiakhondi, A. ., Sadeghi, A. ., & Karbassi Yazdi, A. (2025). Evaluation and Analysis of Factors Affecting Delays in Large-Scale Complex Projects: Case Study of Oil Well Drilling. Spectrum of Engineering and Management Sciences, 3(1), 1-17. https://doi.org/10.31181/sems31202529h

Most read articles by the same author(s)

<< < 1 2 3